BPM London

Fashioning Poplar

Project: Fashioning Poplar The refurbishment of disused locked up garages to provide fashion business space and creative studio workshops, garment manufacturing unit, design and tech spaces and a Double height public café and events space. Contract sum: £5,620,000.00 Contract JCT D&B 2016 Client: Popla Harca This Project required BPM working from project inception with key personnel …

Fashioning Poplar Read More »

Greenwich Peninsula

Contract: Design and Build Client: London and Quadrant Description: The Design and Construction of 475 No. Units at Greenwich Peninsula London, SE10.  This is London and Quadrant’s flagship project, RC Frame and unitized cladding/etc.

Maylands

Project: Maylands, Hemel Hempstead Contract Sum: £22m Contract: JCT 2011DB Client: Hightown Housing Association Works: This 7 story building of concrete frame with rain screen cladding and brickwork consists of 130 Units within two blocks, 77 rental, 53 Shared Ownership, including the commercial space and a completed Church Hall to the ground floor, all delivered …

Maylands Read More »

Royal Wharf

Project: Royal Wharf Contract sum: £110m Contract: JCT D&B Client: Notting Hill Housing This project consists of 450 flats over three phases Worked with the design team at tender stage, advising client as to the preference for design, material specification and components Site supervisor weekly reports issued to summarise the site inspection quality and programme …

Royal Wharf Read More »

Malgavita

Project: Malgavita, Ealing Contract sum: £35m Contract: Development Agreement Client: Clarion Housing Group Works: The project consists of 158 Shared Ownership properties within a larger regeneration development delivering 420 properties. The Development Agreement was acquired with an existing planning permission. BPM worked with the client to prepare and evaluate development offers and negotiate the final …

Malgavita Read More »

Camberwell

Contract sum: £32m Contract: JCT 2011DB Client: Hyde Works: The demolition and site clearing of existing structures, stopping up and reallocation of adopted highways and construction of 164 mixed tenure properties with concrete framed buildings. BPM negotiated the Building Contract documents and the Contractor/Developer pre purchase agreement of 15% of the homes for sale, assisting …

Camberwell Read More »

Northolt Road

Project: Northolt Road/Cumberland Contract Sum: £67m Contract: JV Agreement Client: Origin Works: The demolition and site clearance design and construction of high rise concrete frame buildings accommodating 405nr mixed tenure dwellings with associated landscaping and basement car parking and service connections and community facilities. BPM provide JV Supervisor and Employers Agent services in the development …

Northolt Road Read More »

Beaufort Park

Project: Beaufort Park, Brent Contract Sum: £33m Contract: Development Agreement Client: Notting Hill Housing Works: The project consists of 177 affordable rent properties within a larger development. The Development Agreement was acquired with an existing planning permission. BPM worked with the client to prepare and evaluate development offers and negotiate the final package price, design …

Beaufort Park Read More »

Hertford Road

Project: Hertford Road, Hackney Contract Sum: £16.5m Contract: JCT 2011, Competitive Tender Client: Metropolitan Housing Is a development of 125 apartments and maisonettes of 70% open market sale with values ranging from £300k to £700k including S106 obligations to deliver affordable SO and rented properties. High density development up to 8 storeys to CFSH level 4. The …

Hertford Road Read More »

Lord Alexander House

Project: Lord Alexander House, Hemel Hempstead Contract Sum: £4.9m Contract: JCT 2011 Competitive Tender Client: Hightown Housing Works: Is the conversion and refurbishment of an existing office building into 67 Nr 1 and 2 bedroom flats for rent and shared ownership delivering ECO Homes Very Good by utilising insulated overcladding systems and drylining, double glazed …

Lord Alexander House Read More »

Kingsland Wharves

Contract Sum: £30m Contract: JCT 05 Design and Build Client: London and Quadrant Housing Trust Works: Regeneration of redundant commercial space around the canal basin, retaining listed  buildings returning back into modern commercial spaces within the confines of the listed planning permission. Construction of 6,500m² commercial space, GP surgery, Café and 210 new mixed tenure residential units, landscaped areas and …

Kingsland Wharves Read More »

Coppice Farm

Project: Coppice Farm Road, Construction of 5 nr three bed Houses and associated External Work Contract sum: £910,000.00 Contract JCT D&B 2016 Client: Red Kite This Project required BPM working from project inception with key personnel at Red Kite and the design team to produce a new Employers Requirements document for Tendering. BPM managed technical …

Coppice Farm Read More »